|
Preliminary Port, Stockpile Area, Siltation Pond, Highway & Drainage Structure Design of the MacroAsia Corporation Infanta Nickel Mine
Client: MacroAsia Corporation Location: Brooke's Point, Palawan AMH was engaged by MacroAsia Corporation to conduct engineering study, preliminary engineering activities, and to perform the detailed engineering of its “Infanta Nickel Project”. The development consists of 1,113.98-hectare nickeliferous mineral property located within the Municipality of Brooke's Point in Southern Palawan.
Design Review of Rapu Rapu Tailings Dam and Monitoring of the Rio Tuba Mine
The Rapu Rapu Tailings Dam facility is a copper-zinc-gold-silver mining project of Lafayette Phils., Inc. In the island of Rapu Rapu, Albay, whose development and commercial production was halted due to a mine tailings spill incident. AMH was engaged as part of a third party independent consultant to review the design of the tailings dam. The Rio Tuba Mine is a US$180 million facility for the production of 10,000 tons of nickel and 750 tons of cobalt in the form of mixed sulfides. AMH was engaged to undertake the monitoring of slopes for this facility of Coral Bay Nickel Corporation.
| |||||||||||||||||||||||||
p r o j e c t s |
||||||||||||||||||||||||||